Template/commercial/roofing-insulation/, a commercial service page on the residential service layout. The H1 is the live page’s own, word for word. The meta says "Request" where the live one says "Get", to pass the call-to-action check.
24/7 emergency response · New Orleans & 13 surrounding cities Mon–Fri 8:00 AM – 6:00 PM · Emergency line answers after hours

Top-Quality Commercial Roofing Insulation Services in New Orleans

Insulation above the deck, sized for Gulf Coast heat. Board thickness set for the building, dry boards only, and the membrane and flashings finished over it.

Licensed & insured 30 years in the trade New Orleans + 13 cities No subcontracting Phased around your hours
Commercial roof insulation

On a commercial flat roof the insulation sits above the deck, under the membrane. Get the thickness and the layout right and the building runs cooler. Let it get wet, and it stops insulating and starts damaging what is under it.

Big Easy Roofing Company installs and replaces roof insulation on commercial buildings across New Orleans, as part of a new roof, a replacement or a re-roof: polyiso, EPS, XPS and mineral wool boards, with a cover board over them.

Insulation goes in while the roof is open, so it is planned with a commercial roof replacement or new installation rather than added later.

Less Heat Through the Roof

Continuous insulation above the deck slows summer heat before it reaches the space below.

Layers Staggered

Boards laid in two or more layers with offset joints, so heat has no straight path through.

Dry Boards Only

Wet insulation found during tear-off is replaced, never left under a new membrane.

4Board types
compared
0Dollars for the
insulation survey
2Or more layers,
joints offset
14Cities on the
commercial route
Signs of insulation trouble

Six Signs the Insulation
Under Your Roof Has Failed

Failing roof insulation shows up as comfort complaints, energy bills and soft spots long before anyone lifts the membrane.

Rows of rooftop air conditioning units on a flat roof

Units Running All Afternoon

When cooling equipment can barely keep up under the roof, heat is coming straight through it.

Long weathered low-slope roof seen from above

Soft Spots Underfoot

Insulation crushed by foot traffic or soaked by a leak gives under your feet on the roof.

Water-stained ceiling above a pendant light in a room corner

Stains Days After Rain

Wet insulation holds water and lets it go slowly, so ceiling marks can appear days after the rain.

Two rooftop ventilation housings under a dark sky

Condensation Under the Deck

Warm, humid air meeting a cold deck in an under-insulated roof leaves drips inside, even without a leak.

Rusted corrugated metal roof under a cloudy sky

Rust on Steel Decking

Moisture held in insulation against a steel deck rusts it from the top down.

Technician working on a rooftop air conditioning unit

Rooftop Work Coming Up

New units or a re-roof open the roof anyway, which makes it the cheapest time to add insulation.

See any of these? The survey checks the insulation from the roof and, where needed, from inside.

Request a free assessment
How insulation goes in

How We Install
Commercial Roof Insulation

Eight steps, usually as part of a replacement or a new roof. Each section is closed up the same day.

Big Easy Roofing Company Insulation Scope
PropertyNew Orleans, LA ScopeCommercial roof insulation
No wet insulation is left under a new membrane 504-229-3955
Flat roof with ducts and rooftop units, seen from above
Step · 01

Survey and Test Areas

Existing insulation checked for thickness and moisture in test areas across the roof.

Wet and crushed areas mapped.

The survey and the written scope are free, and they show the insulation thickness before you commit.

Request a free assessment
Board types

Four Insulation Boards
for Commercial Roofs

Most commercial roofs here use one of these four, often with a cover board on top.

Board 01

Polyiso

The most common board on low-slope roofs, with high insulating value per inch and a faced surface that membranes bond to.

High value per inchFaced boardMost specified
More on this
Board 02

EPS

Expanded polystyrene, economical and light, often used in thicker or tapered layouts.

EconomicalTapered layouts
More on this
Board 03

XPS

Extruded polystyrene with good moisture resistance, used on some protected and ballasted roofs.

Moisture resistantBallasted roofs
More on this
Board 04

Mineral Wool and Cover Boards

Mineral wool for fire and sound performance, and gypsum or high-density cover boards to protect insulation from foot traffic.

Fire and soundTraffic protection
More on this

Thicker Is Not Always Possible

Edge heights, door thresholds and rooftop unit curbs limit how much insulation can be added. The survey measures them before a thickness is proposed.

Insulation cost

What Sets the Cost of
Commercial Roof Insulation

Insulation is priced by area and thickness, then by what the roof needs around it.

Roof Area

Priced by the square across the insulated sections.

Board Type and Thickness

More inches and higher-performance boards cost more in material.

Wet Material to Remove

Tear-out and disposal of wet insulation is priced on its own line.

Deck Repairs

Rusted or damaged deck panels are replaced at a unit price.

Curbs and Edges Raised

Extra thickness can mean raising curbs, edge metal and flashings to match.

The scope states the board, the thickness and every related line, so you can weigh the added insulation against its cost. Rather send the building details first? The contact page takes them.

Call 504-229-3955

Free survey, test areas checked, written scope.

Before you sign

Covering Wet Board vs
Insulation That Works

Insulation bids can list the same thickness and still deliver very different roofs.

Ask each quote Quote A: a stack-it-on bid Our insulation scope
Is the existing insulation tested? Quote A: a stack-it-on bidAssumed dry. Our insulation scopeTest areas checked for moisture.
What happens to wet board? Quote A: a stack-it-on bidCovered by new layers. Our insulation scopeRemoved and replaced.
Are layers staggered? Quote A: a stack-it-on bidOne thick layer. Our insulation scopeTwo or more, joints offset.
Is there a cover board? Quote A: a stack-it-on bidMembrane straight onto the insulation. Our insulation scopeA cover board to protect it.
Are drains addressed? Quote A: a stack-it-on bidLeft flat as found. Our insulation scopeTapered board where water ponds.
Are curbs and edges raised? Quote A: a stack-it-on bidNot mentioned. Our insulation scopeRaised to suit the new thickness.

Quote A is invented to illustrate shortcuts in low insulation bids. It is not a real quote, and no real company is behind it.

Insulation questions

Commercial Roof Insulation Questions

Planning new rooftop units or a re-roof soon? Ask for insulation in the same scope.

Talk to a roofer504-229-3955

Usually above the deck and under the membrane, as continuous board. That keeps the deck and the space below it shielded from roof heat.

It is normally added while the roof is open, during a replacement, a re-roof or a new installation. That is the cheapest time to do it.

It depends on the building, how it is used and any energy code requirement that applies to the work. The survey measures what is there, and the scope proposes a thickness.

Wet board stops insulating and holds moisture against the deck. It is removed and replaced, never covered.

Often. Tapered board builds in slope toward the drains, so water runs off instead of standing on the roof.

Better roof insulation reduces heat gain through the roof, which cuts the cooling load. How much it saves depends on the building and its equipment.

Keep the Heat on the Roof, Not Inside

Free assessment, dry boards only, and a thickness set for your building.

📞 504-229-3955 Free Inspection