Template/commercial/replacement/, a commercial service page on the residential service layout. The H1 is the live page’s own, word for word. The live page carries the wrong phone number and an unverified guarantee, neither carried over.
24/7 emergency response · New Orleans & 13 surrounding cities Mon–Fri 8:00 AM – 6:00 PM · Emergency line answers after hours

Commercial Roof Replacement in New Orleans by Big Easy Roofing Company

Tear-off to the deck, phased so you stay open. Deck and insulation checked, a new system named in writing, and each section watertight before the crew leaves.

Licensed & insured 30 years in the trade New Orleans + 13 cities No subcontracting Phased around your hours
Commercial roof replacement

A commercial roof replacement is a construction project on an occupied building. The roof is the easy part. Keeping the building running while it happens, and pricing the deck before anyone has seen it, is where bids differ.

Big Easy Roofing Company replaces low-slope roofs on warehouses, shopping centers, offices and restaurants across New Orleans. The old system comes off to the deck, damaged decking and insulation are replaced, and a new membrane goes on, one section at a time.

Not every worn roof needs this. If the insulation is dry and the building has room under code, commercial re-roofing may do the job with less disruption, and the survey will say which.

Phased Section by Section

Only as much roof as can be made watertight the same day is opened.

Deck Priced Up Front

Decking repairs carry a unit price in the scope, so hidden damage does not become a surprise invoice.

System Named in Writing

Membrane, insulation, cover board and flashing all specified by name.

0Dollars for the
replacement survey
1Section opened
at a time
14Cities on the
commercial schedule
0Sections left open
overnight
Replace or keep repairing

Six Signs a Commercial
Roof Needs Replacing

When two or three of these apply, replacement usually costs less over the next few years than continuing to repair.

Tape measure laid across a sheet of insulation

Wet Insulation Across the Roof

When moisture has spread through large areas of insulation, it cannot be recovered, and the roof loses its insulating value too.

Long weathered low-slope roof seen from above

Membrane Past Its Life

Brittle, shrinking or crazed membrane across the whole roof is worn out, not damaged in spots.

Rusted corrugated metal roof under a cloudy sky

Rust in the Roof Structure

Rust through metal decking or roof panels means the structure under the membrane needs attention.

Rooftop vents along the top of a gray industrial building

Leaks in Many Places

Several leak locations at once point to a system failing everywhere, not one bad detail.

Corrugated warehouse roofs seen from above

Two Roofs Already On

A roof with a second layer on it usually cannot be recovered again, so the next step is a tear-off.

Storm clouds rolling in over open water at sunset

Storm Damage Across the Roof

When wind or hail has damaged most sections, replacement may be what the claim supports.

Two or more of these? The survey shows whether it is repair, re-roof or replacement.

Book a free survey
How replacement runs

How We Replace a Roof
on an Open Building

Eight stages. The building stays in use through every one of them.

Big Easy Roofing Company Replacement Scope
PropertyNew Orleans, LA ScopeCommercial roof replacement
Each section is watertight before the crew leaves 504-229-3955
Flat roof with ducts and rooftop units, seen from above
Stage · 01

Survey the Whole Roof

Membrane, insulation, deck and every detail checked, with test openings where the insulation needs confirming.

The scope rests on this.

The survey and the written scope are free, and the scope shows re-roof and replacement side by side where both are possible.

Book a free survey
Replacement systems

Four Systems for a
New Commercial Roof

The new roof is specified for how the building is used, not picked from a catalog.

System 01

TPO

White, heat-welded and reflective. The common choice for warehouses and retail where cooling cost matters.

ReflectiveWeldedMost common
More on this
System 02

PVC

Chosen where kitchen exhaust or chemicals reach the roof, because it resists grease and many chemicals.

RestaurantsChemical resistant
More on this
System 03

EPDM

A rubber membrane with a long record on low-slope roofs, fully adhered or mechanically fastened.

RubberAdhered or fastened
More on this
System 04

Modified Bitumen

Multi-ply and tough underfoot, for roofs with heavy equipment traffic.

Multi-plyFoot traffic
More on this

Warranties Follow the System

Manufacturer terms on commercial roofs depend on the membrane, the build-up and the installer. The scope lists the terms for the exact system proposed.

Replacement cost

What Sets the Cost of
a Commercial Roof Replacement

Replacement is priced by the square, and then by what makes this building different.

Roof Area

Measured in squares across every section.

Layers Coming Off

Two old roofs take longer to remove, and weigh more to haul away, than one.

Deck Condition

Replaced decking is priced per unit in advance, then counted as the work proceeds.

System and Insulation

Membrane choice and insulation thickness drive the material cost.

Phasing and Access

Working in sections around your hours, and any hoist days, are planned into the price.

Every line is in the written scope, so owners, managers and lenders read the same numbers. Want to begin in writing? The contact page is there.

Call 504-229-3955

Free survey and a written scope, phased around your hours.

Comparing bids

Comparing Commercial
Replacement Bids

Two replacement bids for the same square footage can describe very different projects.

Ask each quote Quote A: a square-foot-and-go bid Our replacement scope
How is the deck priced? Quote A: a square-foot-and-go bidAs an extra, found as the work goes. Our replacement scopeA unit price in the scope, before tear-off.
Is the system named? Quote A: a square-foot-and-go bid"Flat roof" and a total. Our replacement scopeMembrane, insulation and cover board by name.
What about flashings? Quote A: a square-foot-and-go bidReused where they look fine. Our replacement scopeNew at every wall, curb and drain.
Will the building stay open? Quote A: a square-foot-and-go bidNot addressed. Our replacement scopePhased, with a written schedule.
Is paperwork sent first? Quote A: a square-foot-and-go bidAfter work begins. Our replacement scopeInsurance certificate before mobilizing.
Who does the work? Quote A: a square-foot-and-go bidCrews hired for the job. Our replacement scopeOur own crew. We do not subcontract.

Quote A is imagined for illustration from shortcuts common in low commercial replacement bids. It is not a real quote, and it names no one.

Replacement questions

Commercial Roof Replacement Questions

Have a lease, tenant or lender deadline? Tell us before the survey so the phasing fits it.

Talk to a roofer504-229-3955

Yes. The roof is replaced one section at a time, and each section is made watertight the same day. The schedule is agreed with you before work starts.

Deck and insulation replacement carry a unit price in the scope. You know the rate in advance, and the count is recorded with photos as the work proceeds.

If the insulation is dry and there is only one existing layer, a re-roof may be possible. Wet insulation or a second existing layer usually means replacement.

It depends on the roof area, the system, the weather and your working hours. The written schedule sets out the phases.

A written scope, a schedule, and a certificate of insurance with any additional-insured endorsement you need.

Only what can be closed the same day is opened, and each section is sealed before the crew leaves, so an incoming storm does not leave the building exposed.

Replace the Roof, Keep the Doors Open

Free survey, a named system, and a phased schedule in writing.

📞 504-229-3955 Free Inspection